Fixed price.Finish date.In writing.
HDB and condo renovation by our own crew from Ubi. We measure your flat, then send an itemised quote within 48 hours of the site visit.
-
HDB-registered contractorHDB licence no. HB-XX-XXXXX. BCA reg. placeholder.
-
12-month workmanship warrantyIf something we built fails, we come back and fix it.
-
Photos every FridayA WhatsApp update from site, every week the works run.
What it costs
Starting prices for 2026. Your quote lists every item with quantity, material and rate, so you can see exactly where the money goes.
-
Full HDB renovation, 4-room
Hacking, flooring, kitchen, two toilets, carpentry, electrical, plumbing and painting. Permits included.
fromS$38,000whole flat -
Kitchen remake
New cabinets, worktop, backsplash, sink and hob fitted, wiring and plumbing points moved.
fromS$9,800per kitchen -
Bathroom or toilet remake
Hack old tiles, waterproof and test, retile floor and walls, new fittings and vanity.
fromS$6,500per toilet -
Vinyl flooring overlay
Laid straight over your existing tiles. No hacking, little dust, usually done in a day or two.
fromS$4.80per sq ft -
Painting, 4-room flat
Walls and ceilings, two coats, furniture covered and moved back. Colours of your choice.
fromS$1,200whole flat -
Carpentry
Kitchen cabinets, wardrobes, shoe cabinets and TV consoles, made to measure.
fromS$190per foot run -
Hacking, plastering, electrical and plumbing
Wiring by a licensed electrical worker, plumbing by a licensed plumber. Priced per point or per job.
Quoted per jobafter site visit -
Minor repairs
Leaks, sealant, door hinges, lights and fans, cracked tiles. One handyman visit, up to two hours.
fromS$120per visit
Prices are indicative and depend on your layout and materials. The site visit and quote are free.
Book a free site visitHow a job runs
Six steps, in this order, every time. You always know what happens next and who is on site.
Free site visit
We measure every room, check pipes and wiring, and tell you what HDB or your condo allows in your block.
About 45 minutesItemised quote
Every line priced: quantity, material, rate. No lump sums hiding behind "miscellaneous".
Within 48 hours of the visitDesign and 3D, if you need it
Layout drawings and a 3D view for kitchens and carpentry. Skip it if you already know what you want.
Optional, about a weekWorks start
We get the permits, notify neighbours and protect the lift and corridor. You get photos on WhatsApp every Friday.
Start date written into the contractHandover and defects check
We walk every room with you on a checklist, fix what's on it, then clean the whole flat.
Before the final payment12-month warranty
Our workmanship is covered for a year from handover. Message us and we book a visit.
In writing, with your handover papers
Before and after
Drag the yellow handle to compare. On a keyboard, focus it and use the arrow keys.






Example photos for illustration. Your project photos go here.
Kitchen remake
A typical scope for a 4-room HDB kitchen.
- Time on site2 to 3 weeks
- CabinetsAbout 16 ft run
- WorksHack, tile, carpentry
- Typical spendS$12,000 to S$18,000
Living room
Skim coat, new ceiling cornice, vinyl overlay and paint.
- Time on siteAbout 1 week
- FlooringVinyl over old tiles
- WorksPlaster, floor, paint
- Typical spendS$4,000 to S$7,000
Toilet remake
Full hack-out, waterproofing with a 24-hour flood test, then retile.
- Time on site7 to 10 days
- WaterproofingFloor and wall base
- WorksHack, waterproof, tile
- Typical spendS$6,500 to S$9,500
Where we work
All of Singapore, from our workshop in Ubi. These are the estates we're in most weeks.
North
Woodlands, Yishun, Sembawang, Admiralty
North-East
Sengkang, Punggol, Hougang, Serangoon, Ang Mo Kio
East
Tampines, Bedok, Pasir Ris, Simei, Eunos, Ubi
West
Jurong West, Bukit Batok, Clementi, Choa Chu Kang, Bukit Panjang
Central
Toa Payoh, Bishan, Queenstown, Kallang, Bukit Merah, Marine Parade
Your customer reviews go here
Google reviews or short quotes from homeowners, shared with their permission, with the estate and the work done.
Questions we get
Not here? WhatsApp us a photo of the room and your question.
Do I need a permit for my renovation?
For an HDB flat, works such as hacking walls, replacing floor tiles, changing windows or reworking a toilet need an HDB renovation permit. Painting, vinyl overlay and most carpentry don't. We apply for the permit for you and start once it's approved.
For a condo, the management office (MCST) needs your renovation form and usually a refundable deposit. We prepare the drawings and paperwork they ask for.
What are the HDB renovation hours?
| General works, Mon to Sat | 9am to 6pm |
|---|---|
| Noisy works (hacking, drilling), weekdays | 9am to 5pm |
| Sundays and public holidays | No works |
We put up a notice for your neighbours before works start, with our contact number on it.
How do payments work?
| On signing the contract | 10% |
|---|---|
| When works start | 40% |
| After tiling and carpentry are installed | 40% |
| After handover and defects are fixed | 10% |
PayNow or bank transfer. You pay against progress you can see, never the full amount upfront.
How long will it take?
| Full 4-room renovation | 6 to 8 weeks |
|---|---|
| Kitchen remake | 2 to 3 weeks |
| One toilet | 7 to 10 days |
| Vinyl flooring | 1 to 2 days |
| Painting a 4-room flat | 2 to 3 days |
Counted from permit approval. The finish date goes into your contract.
Can we stay in the flat during works?
For painting, flooring or a single toilet, most families stay. We cover furniture and clean up daily. For a full renovation or a kitchen remake it's easier to stay elsewhere for the noisy weeks, and we'll tell you which weeks those are.
Book a free site visit
Tell us a little about the flat. We reply the same working day to arrange a time.
Request received
Demo only: in a live site this goes straight to the owner's WhatsApp and email, and they reply to arrange the visit.